Follow the New Pavilion Building works
Today we launch the time lapse web camera that is following the building of the new pavilion on pitch 2.
Follow on this link
Today we launch the time lapse web camera that is following the building of the new pavilion on pitch 2.
Follow on this link
The draws for the January 2024 was as follows:
Thanks to Lexie Owen for drawing the numbers
The draws for the February 2024 was as follows:
Thanks to Claire Owen for drawing the numbers
Aston Rowant Cricket Club are holding an open consultancy meeting on Thursday 24th August at 8.00pm. The meeting is open to all club members and members of the public.
The meeting is to allow the club to explain the three-phase approach to the re-development of the club off field facilities. These are very different to the previous plans.
Phase 1 The purchase and installation of a wooden pavilion on the bottom field, field 2.
Phase 2 The relocation of the groundsmen’s equipment sheds.
Phase 3 The replacement of the current pavilion on the top field, on the site of the current pavilion.
Draft plans for phase 1 are available on the links below and the notice boards outside on the club walls and inside the clubhouse.
These drawings are for discussion and we are looking for feedback on them prior to a planning application later in the year.
Please try and look at the drawings and we look forward to comments.
ARCC Committee
Aston Rowant Cricket Club Floor Plan
Aston Rowant Cricket Club Front Elevation